Manifest

Outlander · Black Rock City · year two

Next deadline

2 days

Commit campmates for Reno Hexayurt OSS

2026-07-09

State: At risk

Blockers

  • Reno Hexayurt OSS H10 is still a gap

    shelter · 2026-07-09 · 2 days

  • CO alarm is still a gap

    safety · 2026-07-17 · 10 days

  • Evaporative cooler is still a gap

    verification · 2026-07-27 · 20 days

  • Honda EU2200i is still a gap

    power · 2026-07-27 · 20 days

  • 7 gal water container is still a gap

    water · 2026-08-01 · 25 days

  • Fire extinguisher is still a gap

    safety

  • First aid kit is still a gap

    safety

Dimensions

  • shelter

    at_risk

    7 gaps remaining

  • transport

    ready

    Covered by inventory or a decided acquisition

  • power

    at_risk

    1 gap remaining

  • water

    at_risk

    1 gap remaining

  • safety

    blocked

    CO alarm, extinguisher, and first aid cannot be deferred or substituted

  • verification

    in_progress

    Physical checks still sit on the schedule